- starting date
- 2018
- Location
- The western desert – between MATROUH and SIWA , Matrouh - Egypt
- client
- Talaat & Imam Consulting Engineers
Brief Description
Design the duplication of the road connecting Siwa city with Matrouh city to convert the existing road from two-way two-lane to divided highway.
The road length is almost 300 km with many pipes and culverts crossings along the road
