- starting date
- 2009
- Location
- Shebeen El koom- El Monofeya , Shebeen El koom- El Monofeya
Brief Description
The project involved a comprehensive assessment of the existing 60,000 m³/day wastewater treatment plant in Shebeen El Koam, covering structural, process, hydraulic, electromechanical, and architectural systems. Based on the evaluation, detailed rehabilitation designs were prepared along with tender documents, technical specifications, and Bills of Quantities to support the upgrading of the facility.
